On June 4, 2026, the White House shared official photographs depicting the Lincoln Memorial Reflecting Pool once again reflecting its surroundings after weeks of renovation work. The pool had been empty during repairs but was restored to full operation.
The $1.5 million project involved deep power washing, fumigation, and the application of a new bright blue basin coating. Local reports confirmed that water began flowing into the pool on Thursday following completion of the renovation.
This restoration coincides with America’s 250th anniversary celebrations, as the White House credited President Trump for ensuring timely delivery of the project. The Reflecting Pool, which contains nearly 6.75 million gallons of water and provides mirror images of both the Lincoln Memorial and the Washington Monument, is a key feature of the National Mall landscape.